Machine-control models and GPS construction data

Machine-control models built for confident site delivery.

Remote model and data preparation for earthworks, roads and grading. We turn your supplied drawings, levels and surfaces into an agreed package for the intended machine-control or GPS construction workflow.

Excavator operating with GNSS machine-control equipment on a civil construction site
Site-ready model preparation
Defined scopeInputs, limits and intended use are confirmed before modelling begins.
Coordinated dataSupplied design information is organised into a practical model package.
Checked deliveryModel content and assumptions are reviewed before issue.

Service overview

A practical bridge from design drawings to machinery.

Machine-control modelling converts relevant project geometry and levels into an agreed digital package for civil construction workflows. It can support roadworks, earthworks and other defined site tasks where clear 3D information is required.

Every job is scoped around the supplied design, the limits of work and the intended use. If information is unclear or inconsistent, it is identified for review rather than quietly assumed.

Scope note: Exact file outputs and model content are confirmed before work starts so the deliverable suits the nominated site workflow.

See it built

How we build machine-control files, step by step.

Short videos showing how each model comes together from the drawings, and the checks we do along the way. Illustrative examples.

Roads: built from the long and cross sections, with box limits sized to the kerb type
Drainage: every pit checked against the drawings, and falls between pits rechecked
Sewer: every manhole checked, and grades rechecked on every leg
Bulk earthworks: design levels checked, with cut, fill and net balance by stage

Equipment and file requirements

Data prepared around your equipment and task.

Tell us the machine-control platform and construction work the files need to support. Include Trimble or Topcon details where relevant, the controller or software version and the required export specification. We confirm the proposed outputs before work starts.

Include the current design revision, coordinate system and datum, units, model limits and target date where known. If your design changes, identify the new revision and affected area so the impact on the model, outputs and timing can be reviewed.

Remote preparation: Available for projects in Australia, the United Kingdom and New Zealand. Onsite set-out and pickup support is offered separately in Melbourne.

See what detailed preparation includes in our GPS drainage and road-boxing data guide.

Drainage, sewer and road boxing

More detail for the work in front of the machine.

A useful GPS file can show the features that help the crew interpret the supplied design. We agree which details are needed for your package before preparation begins.

Pipe and trench information

Drainage and sewer data can include pipe size and type labels, together with trench limits based on the pipe and supplied project requirements. This gives operators a clearer reference for the intended excavation width.

Pit references

Pit excavation limits and levels can be included alongside jump-up references from pit centres. The agreed files distinguish the pit reference from the excavation information the crew needs.

Road-boxing limits

Boxing linework can account for the relevant kerb size and type in the supplied details. Defined limits help the operator see the intended extent of the road excavation.

Design checks

We compare supplied earthworks surfaces with design drawings, levels and falls, and raise discrepancies for clarification. Conflicting information needs a decision from the responsible project contact.

Brief the task: Send the current drainage or sewer plans, pipe and pit schedules, kerb and boxing details, available design files and the required equipment outputs. Prepared data supports the agreed workflow and is used alongside the current approved plans and site procedures.

What to send

The information that helps us quote accurately.

Send what you have. We will identify any missing information that affects the proposed scope. For the full list, see what to send for a machine control model.

01

Design drawings

The current issued plans and relevant revisions for the area to be modelled.

02

Surface information

Available existing and proposed levels, contours or digital surface data.

03

Work limits

A clear description of the construction area, stages and required model extent.

04

Intended use

The machinery or site workflow the model needs to support and the required date.

Our process

Clear decisions at each stage.

A straightforward workflow keeps the model aligned with the supplied information and the site requirement.

01

Review

We check the supplied drawings, data, revision status and model limits.

02

Confirm

We define the intended use, inclusions, assumptions and agreed outputs.

03

Build and check

The model is prepared and reviewed against the agreed source information.

04

Issue

You receive the agreed files together with relevant notes and assumptions.

Civil excavator working from machine-control site data

Agreed deliverables

A model package shaped around its end use.

Depending on the available source information and agreed scope, the delivery package may include:

  • 3D surfaces and relevant linework for the defined work area
  • Clear model limits, layer organisation and staged content where required
  • Export files agreed before the job begins
  • Notes covering source information, assumptions and identified queries

Frequently asked questions

Machine-control model FAQs.

What information is needed to prepare a machine-control model?

Send the current design drawings and revisions, available surface or level information, the work limits or stages, and the intended machinery or site workflow.

What can the model package include?

Depending on the source information and agreed scope, it may include 3D surfaces, relevant linework, organised or staged content, agreed export files, and notes on assumptions or queries.

What types of civil work can the models support?

Machine-control models can support roadworks, earthworks and other defined site tasks that require coordinated 3D project information.

How are unclear or inconsistent design inputs handled?

Questions or inconsistencies identified in the supplied information are raised for review rather than being quietly assumed.

Which file formats will be supplied?

Output files are agreed for each job. Send your platform, controller or software version and required format with the project brief. We will confirm the deliverables and any input gaps before starting.

Have drawings ready for a machine-control model?

Send the project location, required date and available files. We will review the information and confirm a practical scope.

Scroll to Top